Thursday, May 24, 2012

The start of the Modules

Well, the Door Slab layout was OK. Learned a lot. However, since I now have more space and didn’t get too far with it…..well, it will be morphing into modules. Initial plan is:
plan-20120523.jpg

More pictures after the break…

2012-05-22_21-16-59_174.jpg
The left is the yard module. MTL track will be used, mainly salvaged from the Door Slab Layout. The internal “yard” area may be a transmodal yard or auto yard. Or something else. I won’t know until I build that part. =) Continplating using servos to control the turnouts. The right is a simple turn around. Rokuhan track. Not sure what the “scene” will be. Probably simple “country” scene.

2012-05-18_10-56-13_549.jpg
Another image of the base unit.

Underside of the two units joined together..
2012-05-25_21-48-46_690.jpg