First outing for the yard and return modules.
Last night was a marathon to get just this plywood pacific running. I somehow borked the wiring and ended up with a short. Didn’t get a chance to test run on the unproven track. Also had plan to run two trains. However, thanks to the USPS detouring the package to Iowa……I couldn’t. Probably a good thing in the long run as I didn’t have time to prep for a 2 train setup. Went to bed around 3a and then work up at 5 to temporarily fix the borked wiring.